+1 for a 6-months cycle.... 0.3.12 is actually taking more than 4 months (even more than 6 months, but isnt usual)

On Sun, Oct 10, 2010 at 1:09 PM, Kamil Hornicek <kamil.hornicek@reactos.org> wrote:
I'd vote for a six months release cycle. ...in case we can actually enforce it.
----- Original Message -----
Sent: Saturday, October 09, 2010 3:14 PM
Subject: [ros-dev] ReactOS development cycle

I think its a good time to discuss current development cycle. 
It become clear to me, that there is no way we can currently adhere to 3 months development cycle. Its pointless to stick to something we managed to succeed only once or twice. 
Agreeing with the fact we do need releases, for various reasons, i would like to propose a new, longer cycle.

The most apparent choices to me are 4 and 6 month ones. At least half of the cycle would be spent on all out development, with the following half turning its concentration to stabilizing trunk, searching for regressions and bugs, fixing them. The cycles would be separated by branching the release version. The actual release would be taking place on the first month of the NEXT DEVELOPMENT cycle. The actual emergency hacking, writing changelog etc. One month is more than enough, to release two RC (at the branching and next one - after two weeks). End of the month must result in final release. RC should be rather released internally for testing purposes on a default iso.

The actual proposals are:

4 months:

month 1: Development on version x. At the same time, the Release x-1 is to be final-tested, emergency-hacked, changelogged and shipped. The deadline is end of month 1.
month 2: Development on version x. All development that can affect trunk stability, but also will not be shipped with the release X should end or be limited to branch only by the end of this month;
month 3: Switching from development more to stabilizing trunk, searching for regressions, fixing bugs. Finalizing sub-projects that are to be included in release x;
month 4; No new functionality/code, bug-fixing and hunting regressions. This month should end with branching for release x;

6 months:

month 1: Development on version x. At the same time, the Release x-1 is to be final-tested, emergency-hacked, changelogged and shipped. The deadline is end of month 1.
month 2: Development on version x;
month 3: Development on version x. All development that can affect trunk stability, but also will not be shipped with the release X should end or be limited to branch only by the end of this month;
month 4: Switching from development more to stabilizing trunk, searching for regressions, fixing bugs. Ongoing development work only for features that are to be shipped with release x;
month 5: Switching from development more to stabilizing trunk, searching for regressions, fixing bugs. Finalizing sub-projects that are to be included in release x;
month 6: No new functionality/code, bug-fixing and hunting regressions. This month should end with branching for release x;


_______________________________________________
Ros-dev mailing list
Ros-dev@reactos.org
http://www.reactos.org/mailman/listinfo/ros-dev

_______________________________________________
Ros-dev mailing list
Ros-dev@reactos.org
http://www.reactos.org/mailman/listinfo/ros-dev