----- Original Message -----
Sent: Saturday, October 09, 2010 3:14
PM
Subject: [ros-dev] ReactOS development
cycle
I think its a good time to discuss current development cycle.
It
become clear to me, that there is no way we can currently adhere to 3 months
development cycle. Its pointless to stick to something we managed to succeed
only once or twice.
Agreeing with the fact we do need releases, for various reasons, i would
like to propose a new, longer cycle.
The most apparent choices to me are 4 and 6 month ones. At least half of
the cycle would be spent on all out development, with the following half
turning its concentration to stabilizing trunk, searching for regressions and
bugs, fixing them. The cycles would be separated by branching the release
version. The actual release would be taking place on the first month of the
NEXT DEVELOPMENT cycle. The actual emergency hacking, writing changelog etc.
One month is more than enough, to release two RC (at the branching and next
one - after two weeks). End of the month must result in final release. RC
should be rather released internally for testing purposes on a default
iso.
The actual proposals are:
4 months:
month 1: Development on version x. At the same time, the Release x-1 is
to be final-tested, emergency-hacked, changelogged and shipped. The deadline
is end of month 1.
month 2: Development on version x. All development that can affect trunk
stability, but also will not be shipped with the release X should end or be
limited to branch only by the end of this month;
month 3: Switching from development more to stabilizing trunk, searching
for regressions, fixing bugs. Finalizing sub-projects that are to be included
in release x;
month 4; No new functionality/code, bug-fixing and hunting regressions.
This month should end with branching for release x;
6 months:
month 1: Development on version x. At the same time, the Release x-1 is
to be final-tested, emergency-hacked, changelogged and shipped. The deadline
is end of month 1.
month 2: Development on version x;
month 3: Development on version x. All development that can affect trunk
stability, but also will not be shipped with the release X should end or be
limited to branch only by the end of this month;
month 4: Switching from development more to stabilizing trunk,
searching for regressions, fixing bugs. Ongoing development work only for
features that are to be shipped with release x;
month 5: Switching from development more to stabilizing trunk, searching
for regressions, fixing bugs. Finalizing sub-projects that are to be included
in release x;
month 6: No new functionality/code, bug-fixing and hunting regressions.
This month should end with branching for release x;