Hi, I will have to take down the Fezile server for a short period of time in about 2 weeks
due to a move of the server room to a fireproof, fairly burglarproof security room
(brickswork with steeldoor, no windows). However, it is beeing remodelled right now, and
then the aircondition, ethernet lines and power is going to be installed, so I guess two
weeks.
I have some computers to move so the power down may take some time, but I will try to make
the move as fast as possible.
During this time I will try to prepare for a ReactOS LAN behind the Fezile server on the
second and third LAN adapter, for example for build testing on real hardware or another
build bot.
Yours sincerely,
Jaix Bly (Jan Blomqvist Kinander)
Show replies by date